§ 117.747. Raritan River.
152 words·~1 min read·
/us/cfr/t33/s§ 117.747·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)The draw of New Jersey Transit Rail Operations Railroad Bridge at mile 0.5 shall open on signal; except that, from 6 a.m. to 9:30 a.m. and 4:30 p.m. to 7:30 p.m., Monday through Friday, except holidays, the bridge need not open.
(b)The bridge owner shall provide and keep in good legible condition two clearance gauges with figures not less than 12 inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(c)Trains and locomotives shall be controlled so that any delay in opening the draw span shall not exceed ten minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, the train may continue across the bridge and must clear the bridge interlocks before the bridge may be opened. \[USCG-2009-0202, 74 FR 49325, Sept. 28, 2009\]
Connections8 cite this
Cited by 8 sections
register
- Rules and RegulationsNotice of temporary deviation from regulations
- NoticesNotice of temporary deviation from regulations
- NoticesNotice of temporary deviation from regulations
- Rules and RegulationsFinal and temporary regulations
- Rules and RegulationsNotice of temporary deviation from regulations
- UnknownFinal rule
- Rules and RegulationsNotice of temporary deviation from regulations
- UnknownFinal rule
Citation graph
cites case law
§ 117.747
Raritan River.
Fed. Reg.×8
Cites 0Cited by 8 across 1 source